MIL-STD-849B
TABLE XV. Classification of defects - solid and extended skirt parachute canopies - cargo - Continued.
Classification
No. Defect Major/Critical Minor
Over 1/4 inch 137
Rows of stitching not through skirt band webbing 138
25. Overfold of main seam around skirt webbing not straight 224
26. Matching of centerline of seams when folded
1/8 inch to 1/4 inch 225
Over 1/4 inch 139
27. Tape or webbing used to form skirt hem does not extend
across a minimum of 1 gore 140
28. Tucks, where section of gore fabric caught in stitching of seams or hems
Up to 1/4 inch wide and up to 1-1/2 inch long 226
Over 1/4 inch wide regardless of length 141
Over 1-1/2 inch long regardless of width 142
29. Mismatching of cross seams
First seam from vent over 2-1/2 inches and up to 3 inches 227
First seam from vent over 3 inches 143
All other seams over 3 inches and up to 3-1/2 inches 228
All other seams over 3-1/2 inches 144
30. Vent lines out of sequence 145
31. Suspension and vent line overlap on canopy
Up to 1/4 inch minus 229
Over 1/4 inch minus 146
Over 1 inch plus 230
32. Suspension lines not in proper channel or lines crossed 147
33. Cut, frayed, or damaged suspension or vent lines 148
34. Variation in suspension line length per set, between vent and skirt
Up to 1/2 percent 231
Over 1/2 percent 149
35. Variation in suspension line length between vent and skirt
68
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business