MIL-DTL-40137F
6.2 Acquisition requirements. Acquisition documents should specify the following:
a.
Title, number, and date of this specification.
b.
The specific issue of individual documents referenced (see 2.2.1 and 2.3).
c.
First article inspection, if required (see 3.1, 4.2, and 6.3).
d.
Protective finish, if not as specified (see 3.5.2).
e.
Conformance inspection, if different (see 4.3).
f.
Sampling level (see 4.3).
g.
Component and material inspection requirements, if different (see 4.3.1).
h.
Packaging (see 5.1).
6.3 First article. When a first article sample is required, it shall be inspected and
approved under the appropriate provisions of Defense Acquisition Regulations (DAR) 7-104.55,
"Enforcement of Marketing Programs". The first article should be a preproduction sample and
consist of one unit. The contracting officer should include specific instructions in all acquisition
documents regarding arrangements for inspection and approval of the first article.
6.4 Subject term (key word) listing.
cargo
riser
shackles
suspension
tiedown
6.5 Changes from previous issue. Marginal notations are not used in this revision to
identify changes with respect to the previous issue due to the extent of the changes.
Custodians:
Preparing Activity:
Army - GL
DLA - GS1
Navy - AS
Air Force - 11
(Project 1670-1055)
Review Activities:
Army - AV
Navy - MC
Air Force - 71, 99
NOTE: The activities listed above were interested in this document as of the date of this
document. Since organizations and responsibilities can change, you should verify the currency
of the information above using the ASSIST Online database at https://assist.daps.dla.mil.
6
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business