MIL-PRF-9884F
TABLE I Verification methods
Title
Requirements
Verification
3.2
4.3
OPERATING REQUIREMENTS
Dynamic crushing street
3.2.1
4.3.1
Rebound energy
3.2.2
4.3.1
Static load
3.2.3
4.3.2
Cutability
3.2.4
4.3.3
3.3
4.4
INTERFACE AND INTEROPERABILITY
REQUIREMENTS
Dimensions
3.3.1
4.4.1
Surfaces
3.3.2
4.4.2
3.4
4.5
SUPPORT OR OWNERSHIP
REQUIREMENTS
Weight
3.4.1
4.5.1
Water resistant
3.4.2
4.5.2
Moisture content
3.4.3
4.5.3
Water adsorptiveness
3.4.4
4.5.4
3.5
4.6
ENVIRONMENTAL REQUIREMENTS
4.2 Verification methods. Verification methods can include visual examination,
measurements, testing, certification and similarity to previously-approved or previously-qualified
designs.
4.2.1 Verification alternatives. The manufacturer may propose alternative test methods,
techniques, or equipment, including the application of statistical process control, or cost-effective
sampling procedures to verify performance. The contract may specify alternatives that replace
verifications required by this specification.
4.3 Operating requirements verification. All user requirements shall be verified as follows:
4
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business